US electrical estimating for data centers

A Division 26 estimate built around the bid documents.

Data Center Estimating prepares electrical takeoffs and bid build-ups for subcontractors bidding data center work. The estimate keeps quantities, scope boundaries, vendor inputs and assumptions visible for estimator review.

What comes back

01

Division 26 takeoff organized by system

02

Scope and interface schedule linked to the pack

03

Bid build-up ready for human estimator review

Built for engineering bidsSource-linked outputsHuman review before issueAU, UK and US terminology mapped

Services

Defined outputs for a live bid

Each engagement starts with the documents you have and ends with a reviewable deliverable.

Illustrative example

A deliverable that can be checked line by line

This synthetic extract shows the structure. It does not represent a client, project or result.

RequirementSourceAction
MV feedersSLD E-001 and specification 26 05 13Measure route and confirm terminations
UPS distributionEquipment schedule and floor planSeparate supply and install scope
Generator controlsSequence of operationRaise controls interface question

Method

Estimate the system, then check the boundaries

01

Control the documents

Index the issued drawings, specifications, schedules, addenda and bid forms.

02

Measure and classify

Build quantities by system and keep drawing references beside the takeoff.

03

Review and reconcile

A human estimator checks scope, vendor inputs, allowances and exclusions before use.

Field notes and tools

Useful before the bid closes

Browse all resources →

Project enquiry

Tell us what is in the tender pack

Share the job type, bid stage, deliverables and closing date. A person reviews every enquiry.