Electrical estimating service
Division 26 electrical takeoff
Data center electrical packages spread quantities across single line diagrams, plans, schedules and specifications. The takeoff groups measured items by system and preserves the drawing reference and scope note beside each quantity.
Illustrative example
What the reviewed deliverable contains
The rows below are synthetic. They show the structure of the output, not a client project.
| Item | Source | Review status |
|---|---|---|
| Feeder F-12 | SLD E-001 | Route quantity open |
| PDU schedule | E-401 | Count checked |
| Grounding conductor | 26 05 26 | Method note required |
Deliverables
What you receive
- Drawing and specification register
- Quantity takeoff by electrical system
- Measurement basis and drawing references
- Scope gap and clarification list
- Estimator review notes
Inputs
What we need from you
- Issued drawings and specifications
- Bid forms or bill of quantities
- Addenda and clarification responses
- Your scope split and preferred takeoff structure
Checked by people
How the work moves from pack to issue
Set the scope
We agree the Division 26 systems, document set and measurement rules.
Build the takeoff
Quantities are measured and linked to drawings, schedules and specifications.
Review
A human estimator reviews boundaries, assumptions and unusual items before handover.
Scope boundary
What is not included
- Engineering design or registered engineer sign-off
- Supplier commitments made without approval
- Unverified market rates
- Submission on the bidder's behalf
Project enquiry
Discuss division 26 electrical takeoff
Share the job type, bid stage, deliverables and closing date. A person reviews every enquiry.