Electrical estimating service

Division 26 electrical takeoff

Data center electrical packages spread quantities across single line diagrams, plans, schedules and specifications. The takeoff groups measured items by system and preserves the drawing reference and scope note beside each quantity.

Illustrative example

What the reviewed deliverable contains

The rows below are synthetic. They show the structure of the output, not a client project.

ItemSourceReview status
Feeder F-12SLD E-001Route quantity open
PDU scheduleE-401Count checked
Grounding conductor26 05 26Method note required

Deliverables

What you receive

  • Drawing and specification register
  • Quantity takeoff by electrical system
  • Measurement basis and drawing references
  • Scope gap and clarification list
  • Estimator review notes

Inputs

What we need from you

  • Issued drawings and specifications
  • Bid forms or bill of quantities
  • Addenda and clarification responses
  • Your scope split and preferred takeoff structure

Checked by people

How the work moves from pack to issue

01

Set the scope

We agree the Division 26 systems, document set and measurement rules.

02

Build the takeoff

Quantities are measured and linked to drawings, schedules and specifications.

03

Review

A human estimator reviews boundaries, assumptions and unusual items before handover.

Scope boundary

What is not included

  • Engineering design or registered engineer sign-off
  • Supplier commitments made without approval
  • Unverified market rates
  • Submission on the bidder's behalf

Project enquiry

Discuss division 26 electrical takeoff

Share the job type, bid stage, deliverables and closing date. A person reviews every enquiry.