Which files should be handed over?

Use a handoff index that points to the approved estimate and its supporting records. Keep superseded estimates separate from the live basis.

Estimate handoff index
GroupRecordStatus
BasisCurrent drawings and assumptionsApproved or open
QuantityTakeoff and measurement notesReviewed
SupplierQuotes and qualificationsCurrent
RiskOpen items and actionsOwner assigned
ResponseClarifications and departuresAccepted or open

What should the delivery team question?

Question provisional quantities, unclosed interfaces, expiring quotes, allowances and qualifications before using the estimate as a project baseline.

  • Current source set
  • Scope boundary
  • Supplier validity
  • Open design inputs
  • Approved commercial position

What does a handoff not guarantee?

It does not guarantee final cost or design. It gives the project team a traceable basis to validate as the work develops.

Common questions

What else should the bid team know?

What should a estimate handoff include?

It should include estimate, takeoff, source index, supplier returns, assumptions, exclusions, risks and approvals.

Who reviews a estimate handoff?

The estimating lead hands over the records and the project team accepts, updates or re-prices the basis.

Does this page create project quantities?

No. Use the issued drawings, schedules and specifications. The estimator reviews and approves the project basis.

Primary sources

  1. MasterFormat 2026Construction Specifications Institute
  2. NFPA 70, National Electrical CodeNational Fire Protection Association
  3. ANSI/TIA-942 Telecommunications Infrastructure Standard for Data CentersTelecommunications Industry Association
  4. Tier Standard: TopologyUptime Institute